Net Zero Platforms

Output Pathways & Phased Deployment

One platform. Multiple high-value outputs. Capital deployed in phases — only when commercial milestones are proven.

← Back to homepage

A capital commitment ladder — not a leap of faith

You don't commit real capital until Model 4. Everything before that is intelligence-gathering, de-risking, and building the commercial case at your pace.

01
Model

Your waste data — types, volumes, composition — run through the NZP platform. Real output scenarios, commercial value and project economics. See what's possible before touching a spreadsheet.

No cost · No commitment
02
Optimise

Quick-win improvements on existing sites and processes. Increase incineration efficiency or improve waste sorting economics before any larger moves. Minimal capital outlay.

Minimal capital · Fast return
03
De-risk

Pilot gasification pathways alongside existing operations. Build stakeholder and board confidence with phased deployment before any full capital commitment.

No capital leap required
04
Invest

Only here does real capital deploy — and offtake is already contracted. Scale to full production of hydrogen, SAF or syngas with the full delivery chain already in place.

Capital deployed · Offtake secured

One platform. Multiple high-value outputs.

The platform models all viable output pathways from your feedstock. You choose the mix based on offtake availability and commercial priorities — not fixed engineering assumptions.

Power Generation

The fastest path to revenue from commissioning. 75% self-powered operation with 25% exportable surplus. No Fischer-Tropsch synthesis required — immediate commercial return with the lowest CAPEX entry point.

Baseload renewable 75% self-powered Grid export revenue Lowest CAPEX path

RNG / Syngas

The fastest path to contracted offtake — grid-injectable synthetic natural gas using existing pipeline infrastructure. No new buyer behaviour required. Triple revenue from RFS credits, LCFS credits and gas commodity pricing.

Existing grid infrastructure RFS credits LCFS premium Vehicle fuel ready

Green Hydrogen

Model hydrogen yield, purity and commercial value from your specific waste stream. Compare electrolysis alternatives — and show why a 24/7 feedstock-to-H₂ pathway beats intermittent solar-powered electrolysis on economics.

€3–6 / kg Industrial → UHP grade ISO 14687 fuel-cell ready 24/7 baseload

️ Sustainable Aviation Fuel

Model SAF yield via Fischer-Tropsch synthesis from your syngas output, with a major energy company offtake agreement as the backstop. 80 million gallons per year at 1,000 TPD scale. ASTM D7566 certified pathway — domestic and international routing.

$3–5 / gal premium Offtake partner secured 80M gal/yr scale ASTM D7566 certified Domestic & international

Model first.
Invest later.

Bring your waste data to a platform demo — and we'll show you exactly what your streams could generate, and the economics behind it. No consultants. No commitment. No chemistry lecture.

Platform License
Software for your existing site, available today — no technology change required.
Joint Venture
NZP technology combined with your planning pipeline and site access.
Offtake Integration
Plug your H₂ output directly into NZP's contracted network — no separate negotiation required.
Pipeline Partnership
NZP as technology partner across your UK portfolio — structured to scale.
How a modelling run works
Week 1
Share your waste profile and composition data
Week 2
NZP delivers modelled scenarios across all output mixes
Week 3
Review investor-grade outputs with your finance team
ESG & Regulatory Signals
✓ Verified carbon credits on every tonne processed ✓ Only commercially proven PFAS destruction pathway ✓ Scope 3 auditable outcomes for FMCG & waste generators ✓ UK SAF mandate aligned — 10% blend by 2030

We respond within one business day. Your details are never shared.

Offtake, gasification, Fischer-Tropsch and Haber-Bosch partners are already in place — the back end of the value chain is covered.